跳至主要內容
  • Home
  • About Lion
    • About Lion
    • Competitive Comparison
    • Production Process
  • Products
  • News
  • Certificates
    • Patents
    • Certificate of Analysis
  • Contact
  • Members
  • Home
  • About Lion
    • About Lion
    • Competitive Comparison
    • Production Process
  • Products
  • News
  • Certificates
    • Patents
    • Certificate of Analysis
  • Contact
  • Members
English
English 繁體中文 简体中文

Article classification

  • Environmental protection regulations
  • Global environmental current affairs
  • EU WEEE Directive and Current Affairs
  • EU RoHS Directives and Regulations
  • REACH related regulations and current affairs
  • European Union Standards Organization-EN13427~EN13432
  • European Chemical Agency (ECHA)
  • German two-way system DSD-green dot mark
  • EU Energy Use Products Directive
  • Environmental and ecological related reports
  • Articles
  • Pallet specifications by country

Environmental News>

Vietnam Electricity Group (EVN) has instructed its subsidiaries to promote the development of rooftop solar energy projects.

  • 2019-08-13

On July 23, 2019, EVN issued Letter No. 3832/EVN-KD to local power companies, generators, and generator units to promote the development of rooftop solar power. Currently, the local power system is facing significant challenges, therefore EVN is requesting its entities to promote solar power generation to supplement the system's power supply. According to the survey reports from these entities, the total effective installation potential of rooftop solar power from EVN's generators and generator units is 22,217 kWp. The Group requires these entities to complete the installation of rooftop solar power by the first quarter of 2020, ahead of the previously set deadline of December 31, 2020 (as per Letter No. 2641/EVN-KD issued on May 23). Furthermore, according to the reports from power companies regarding rooftop solar power generation, as of June 30, 2019, the total installed capacity was 11,325 kWp, representing 40.4% of the total installed potential capacity of 28,000 kWp. This progress does not meet the Group's requirement to complete the installation by June 30, 2019. The group required all units to proactively allocate funds, accelerate implementation, and complete installation by December 31, 2019. According to unit reports on customer rooftop solar power generation, as of June 30, 2019, the total installed capacity was 154.6 MWp. The power company further strengthened rooftop solar communication, connecting customers with suppliers, creating the most favorable grid conditions for customers to connect to solar power, and signing solar power purchase contracts from customers, The goal is to achieve twice the allocated capacity of solar power installations on customer rooftops by the end of 2019. EVN requires all units to implement this urgently and to promptly report any issues to the group.

上一頁PreviousIf the temperature rises by 0.9℉, the Earth will get sick; 400 million people will suffer from severe water shortages.
NextSix EU banks invest €10 billion to promote the circular economy下一篇
Line

Lion Technology Industrial Co., Ltd.

  • Phone: +886-2-26793552
  • FAX: +886-2-26794698
  • Email: Service@Li-On.Biz
  • Head Office/Factory Address: No. 161, Jianshan Road, Yingge District, New Taipei City 23942
  • No. 161, Jianshan Rd., Yingge Dist., New Taipei City
    23942, Taiwan (ROC)​

Welcome! You are the Free Tools visitors

© 2026 LION Green Design Co., Ltd. All Rights Reserved